Connecting Communities Across Canada for More Than Seven Decades

The history of Acrow in Canada goes back to 1947 and Acrow’s commitment to Canada is unsurpassed. Based in Toronto, Acrow initially supplied formwork to Canadian contractors. Following years of technological development of the Bailey Bridge throughout the 1960s, Acrow Canada installed its first Bailey Bridge in Canada in 1965. It then went on to be the first company to introduce the use of modular Bailey bridges as reliable civilian infrastructure assets across Canada, with the inaugural installation of an Acrow bridge in Canada built over the historic Magaguadavic River in New Brunswick in 1972.
Following World War II, Bailey technology heavily influenced the development of other modular solutions, with Acrow developing the most technologically advanced suite of modular bridging systems available in the world today. A snapshot of these innovative solutions are the industry-leading Acrow 700XS®, and the Mabey product range (which includes the Mabey Compact 200® and the Mabey Delta®). These advanced solutions are much lighter, stronger and longer than the Bailey, and have been installed on more than a thousand successful projects across Canada.. Technologically superior, and only available from Acrow, the sole proprietary manufacturer, this comprehensive product range continues to serve in a wide range of permanent, temporary and emergency applications in Canada and worldwide.
So what has driven the acceptance of panel bridge systems across Canada and what role has Acrow played in ensuring that the modular systems it provides continue to deliver for Canadian contractors, government agencies, and the communities they serve?
With its diverse topography, varied climate, and vast size, the challenges faced by Canadian infrastructure owners are well-documented. From its mountains to valleys, plains to lakes, Canada’s geographical and environmental diversity is extremely challenging, requiring infrastructure solutions which can provide exceptional climate resilience and enhanced structural robustness. A pre-requisite is deep technical expertise to ensure a comprehensive understanding of and response to site-specific requirements, ultimately resulting in safe and trouble-free installations.
Remoteness also poses a significant challenge, not only with regards to the rapid mobilization of materials, machinery and equipment to site, but also in ensuring a structure can be quickly, safely and cost-effectively installed with minimum disruption.
Furthermore, versatility is key, ensuring that connectivity can be created or restored in the most cost-effective manner possible.
DIGITALLY ENGINEERED & SUSTAINABLY MANUFACTURED
As the preeminent modular bridge supplier in Canada, Acrow’s role has been to ensure that its solutions live up to the legacy of the Bailey, and beyond. With their advanced precision-engineered modular componentry made from high-quality high-strength steel, Acrow’s bridges are built to last. Digitally engineered to withstand extreme climates, high wind loads, seismic requirements, frigid temperatures, and the heaviest of Canadian truck or railway load requirements, Acrow’s solutions are hot-dip galvanized to provide reliable and durable corrosion protection with minimal maintenance, and are designed for a service life of over 100 years. Sustainably manufactured in-house in CWB and CISC-certified facilities, Acrow’s solutions are founded in world-class engineering expertise, and serve for decades as permanent reliable infrastructure assets in remote locations or on high-volume roadways, globally.
RAPIDLY ASSEMBLED & EXPERTLY INSTALLED
While durability and longevity are the hallmarks of Acrow’s modular steel bridges, our solutions serve as exemplary emergency solutions too. Locally staged for immediate mobilization, the compact and lightweight nature of our modular components makes them easy to transport. Furthermore, innovative installation techniques ensure trouble-free assembly and installation with Acrow’s technicians providing expert instruction on site preparation, assembly and installation, through to final commissioning. Acrow’s technicians collectively contribute hundreds of years of experience installing bridges under a wide range of challenging conditions, in more than 150 countries around the world, and are committed to ensuring that Acrow bridges are built safely, efficiently, and exactly to specification.
SAFELY DEPLOYED & RELIABLY SERVICED
When installed on a temporary rental basis, Acrow’s panel bridge systems offer an excellent solution for detouring traffic around work zones during bridge rehabilitation or replacement projects. Selected with increasing frequency to provide a cost-effective way to increase workzone safety and reduce construction time, temporary detour bridges keep residents safe by enabling construction to continue without re-routing traffic through local community streets. They also mitigate impacts on the local economy and help keep projects on or ahead of schedule. Acrow’s temporary solutions can also serve as complex truss systems engineered to support structures undergoing reconstruction or rehabilitation.
INNOVATIVELY FINANCED & COMPREHENSIVELY SUPPORTED
Installed quickly, safely and efficiently, and innovatively financed with options to buy or rent to ensure long-term value for money, Acrow’s solutions have supported numerous permanent, temporary and emergency projects across Canada. Projects have included vehicular, pedestrian, industrial, recreational, and railroad applications, as well as unique systems engineered for the support of utilities and covered bridges.
Common to all of these projects has been Acrow’s commitment to providing high-quality sustainable infrastructure which will withstand the test of time and will serve Canada and the Canadian people with passion, integrity and purpose. Established in Canada since 1947, and with offices in Toronto, ON, Vancouver, BC and Montreal, QC, our Canadian team is comprised of engineering and business development professionals with a profound understanding of the specific infrastructure challenges faced by Canadian municipalities and provinces, and a deep commitment to working in partnership to meet Canada’s diverse bridging needs.
As we celebrate Canada Day 2025, we are honored to have been of service to the people of Canada for the past 7 decades and look forward to many more successful collaborations in the future.
ENGINEERED BY CANADIANS
INSTALLED BY CANADIANS
SUPPORTED BY CANADIANS
Immensely proud of our work in support of Canada’s transportation infrastructure since 1947!