Innovative solutions for mission-critical infrastructure
Acrow Wet Gap bridges span the distance needed to complete your mission, whether that be in support of the military as a Line of Communication (LOC) Bridge, or serving humanitarian and disaster relief efforts. Capable of supporting heavy vehicles under a variety of conditions, the bridges are ideal in addressing time-sensitive, mission-critical infrastructure needs
Easy to install floating barge systems facilitate wet gap crossings
Our wet gap solutions feature Acrow 700XS modular bridges supported with an innovative floating barge system. Engineered for large armoured tanks and other heavy vehicles with loads up to Military Load Class (MLC) 120T / 150W, our modular steel bridge components are easily transported, assembled and redeployed as needed.
Acrow’s floating barges serve as rapidly-mobilised intermediate supports for multi-span structures, featuring a strong, durable key-lock system that securely connects to the Acrow 700XS bridge spans without the need for on-site welding. The Acrow 700XS bridges and floating barge system work together to provide immediate, reliable connectivity where existing infrastructure is impaired or destroyed, supporting military Line of Communication (LOC) applications, as well as peacekeeping or humanitarian relief efforts.
Case Studies
See All-
Fort Leonard Wood Case Study
During a two-week period in August 2017, Acrow Bridge took part in training of the U.S. Army Reserve’s 652nd Multi-Role Bridge Company on the assembly and disassembly of Acrow modular steel bridges
Read More -
Military Partnership Case Study
Acrow Bridge has had a long-standing partnership with the U.S. Army, providing bridges used during deployment to bridge gaps for supply runs and other permanent route access needs.
Read More