Acrow’s Detour Rental Solution Minimises Disruptions of Bridge Replacement in Texas
To prevent a long detour during the Taylor Bayou Bridge replacement in Texas, an Acrow 700XS® temporary detour bridge was installed, ensuring uninterrupted access for vehicles and first responders.
Read More -
Detour Bridge From Acrow Carries Heavy Traffic During Parkway Construction in New Jersey
An Acrow 700XS® temporary bridge was installed to ensure uninterrupted traffic flow during the replacement of the aging Garden State Parkway bridge over the Passaic River.
Read More -
Temporary Bridge Replacement in Cairngorms National Park
The quick erection of a temporary bridge has enabled the A93 to remain active until traffic switches to its permanent replacement.
Read More -
Permanent Bridge Installation at Rural Solar Farm Enables Access for Maintenance Vehicles
When Swindon Borough Council needed a replacement for an ageing panel bridge on Shaw Farm, they selected a Mabey Compact 200™ (C200™) from Acrow as the best option to replace the structure, which provides maintenance access to an adjacent solar installation.
Read More -
Acrow Bridge Permits Safe Pedestrian Passage During Waterfront Construction in Seattle
Waterfront Seattle is a multiyear effort to rebuild the city’s central waterfront under the direction of the City of Seattle’s Office of the Waterfront and Civic Projects.
Read More -
Acrow Bridge Provides Access to Alberta Hydroelectric Plant
For 70 years or more, a dependable modular Bailey Bridge provided reliable access to the hydroelectric dam in Seebe, Alberta, located at the confluence of the Kananaskis and Bow Rivers.
Read More -
Modular Steel Bridge Minimises Construction Impacts on Major Regional Cement Plant
When it was time to replace an aging bridge on County Road 1980 near Croydon, Utah, The Utah Department of Transportation (UDOT) utilized a detour of local roads around the site to maintain traffic during what was expected to be a quick project.
Read More -
Acrow Box Bridge Serves as a Temporary Detour Over the Bacchiglione River in Northeast Italy
A modular steel pedestrian box bridge from Acrow was proposed to the local Road Authority and Municipality by project contractor Carraro and after evaluation, was determined to be the optimal solution for the project.
Read More -
Modular Steel Detour Bridge Minimizes Impact of U.S. Highway Upgrades in Rural Oklahoma
While planning the replacement of a structurally deficient bridge on U.S. Route 75 in Okfuskee County, the Oklahoma Department of Transportation (ODOT) required a temporary detour bridge to avoid traffic disruptions during construction.
Read More -
New permanent structure links Outer Hebridean islands
The new Bernera access bridge opened to traffic in December 2021 and the project received an award at the UK’s industry-leading Bridges Awards 2022.
Read More